Recent Events
Upcoming Events
Sr No. |
Document 5D/TEMP. |
Title |
---|---|---|
1. | 5D/XXX-E | FURTHER UPDATES TO THE WORKING DOCUMENT TOWARDS PRELIMINARY DRAFT NEW REPORT ITU-R M.[IMT-2030.EVAL] |
2. | 5D/XXX-E | FURTHER UPDATES TO THE WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M. [FS-IMT COORDINATION] |
3. | 5D/XXX-E | FURTHER UPDATES TO THE WORKING DOCUMENT TOWARDS PRELIMINARY DRAFT REVISION OF REPORT ITU-R M.2527-0 |
4. | 5D/XXX-E | Radiocommunication Study Groups |
5. | 3.2 to WP5D/77-E | WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[IMT.A2G] |
6. | 3.3 to WP5D/77-E | WORKING DOCUMENT TOWARDS PRELIMINARY DRAFT REVISION OF REPORT ITU-R M.2527-0 |
7. | 3.5 to WP5D/77-E | Annex 3.5 to Working Party 5D Chairman’s Report |
8. | 4.5 to WP5D/77-E | Annex 4.5 to Working Party 5D Chair’s Report |
9. | 5.4 to WP5D/77-E | Annex 5.4 to Working Party 5D Chairman’s Report |
10. | 5.6 to WP5D/77-E | Annex 5.6 to Working Party 5D Chairman’s Report |
11. | 5.8 to WP5D/77-E | Annex 5.8 to Working Party 5D Chairman’s Report |
12. | 5.9 to WP5D/77-E | Annex 5.9 to Working Party 5D Chairman’s Report |
13. | 45th WP5D | Documents carry forwarded after WP-5D 44th meeting |
14. | 43rd WP5D | WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[IMT.APPLICATIONS] | 15. | 43rd WP5D | MODIFICATIONS TO WORKING DOCUMENT TOWARDS A PDNR ITU-R M.[IMT-2020.UNWANT.BS] | 16. | 43rd WP5D | STUDIES IN REPLY TO WRC-19 DOCUMENT 550 ON THE VERIFICATION OF RR NO. 21.5 FOR THE NOTIFICATION OF IMT STATIONS WHICH USE AN ARRAY OF ACTIVE ELEMENTS | 17. | 43rd WP5D | IAFI Contribution IMT-Multimedia | 18. | 43rd WP5D | Resolution ITU-R 65 - Principles for the process of future development of IMT-2020 and IMT-2030 | 19. | 43rd WP5D | Excel Sheet: 43rd WP5D Schedule |
20. | 42nd WP5D | FURTHER UPDATE TO WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[CONDITIONS 1.1] |
21. | 42nd WP5D | FURTHER UPDATES TO WORKING DOCUMENT TOWARD PRELIMINARY DRAFT NEW REPORT ON ITU-R [IMT MULTIMEDIA] |
22. | 42nd WP5D | LIAISON STATEMENT TO ITU-R WORKING PARTIES 5A, 5C, 6A, 6B, 6C DEVELOPMENT OF A NEW REPORT ITU-R M. [IMT.MULTIMEDIA |
23. | 42nd WP5D | FURTHER REVISION TO THE WORKING DOCUMENT TOWARDS THE REVISION OF RESOLUTION ITU-R 56 |
24. | 42nd WP5D | PROPOSAL FOR UPDATING OF RESOLUTION ITU-R 65 |
25. | 42nd WP5D | PROPOSAL FOR UPDATE TO THE WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R M.[IMT.VISION 2030 AND BEYOND] |
26. | 42nd WP5D | UPDATE ON ACTIVITIES IN REGION |
27. | 42nd WP5D | UPDATE TO SECTION 5 OF DRAFT CPM TEXT OF AI 1.1 |
28. | 42nd WP5D | PROPOSED MODIFICATIONS TO ITU-R M.1036 | 29. | 41st WP5D | FURTHER UPDATE TO WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[CONDITIONS 1.1] |
30. | 41st WP5D | FINALIZATION OF DRAFT NEW REPORT ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE] |
31. | 41st WP5D | WORKING DOCUMENT ON SHARING AND COMPATIBILITY STUDIES OF IMT SYSTEMS IN THE FREQUENCY BANDS 6425-7 025 MHz AND 7025-7 125 MHz IN ACCORDANCE WITH RESOLUTION 245 (WRC-19) |
32. | 41st WP5D | FURTHER UPDATES TO DRAFT WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[IMT.ABOVE 100 GHz] |
33. | 41st WP5D | FURTHER UPDATES TO WORKING DOCUMENT TOWARD PRELIMINARY DRAFT NEW REPORT ON ITU-R [IMT MEDIA] |
34. | IAFI | IAFI Roadmap for ITU and APT Contributions for 2021 and beyond |
35. | [ 274 ] | Working document towards preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 and Beyond] - IMT Vision - Framework and overall objectives of the future development of IMT for 2030 and beyond |
36. | [ 275 ] | [Draft] liaison statement to external organizations - Study on IMT Vision towards 2030 and beyond |
37. | [ 287 ] | Working document towards a preliminary draft new Report ITU-R M.[IMT.C-V2X] - The use of the Terrestrial Component of IMT for [Cellular-Vehicle-to-Everything] Application |
38. | [ 339 ] | Working document towards a preliminary draft new Report ITU-R M.[CONDITIONS 1.1] - Technical and regulatory conditions for the protection of stations of the Aeronautical Mobile Service (AMS) and Maritime Mobile Service (MMS) located in international airspace or waters (i.e. outside national territories) and operating in the frequency band 4 800-4 990 MHz |
39. | [ 278 ] | Draft initial working document towards Draft CPM Text on WRC-23 agenda item 1.2 |
40. | [ 289 ] | Draft framework for working document for sharing and compatibility studies of IMT systems in the frequency band [XXX-YYY] MHz |
41. | [ 290 ] | Working document for sharing and compatibility studies of IMT systems in the frequency bands 10-10.5 GHz |
42. | [ 291 ] | Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz |
43. | [ 292 ] | Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz |
44. | [ 331 ] | Working document towards preliminary Draft CPM Text for WRC-23 agenda item 1.4 |
45. | [ 332 ] | Working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]/working document related to WRC-23 ai 1.4 - Spectrum needs, usage and deployment scenarios, and technical and operational characteristics for the use of high-altitude platform stations as IMT base stations (HIBS) in the mobile service in certain frequency bands below 2.7 GHz already identified.. |
46. | [ 285 ] | Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHZ] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65/24.75-25.25 GHz and 27-27.5 GHz |
47. | [ 288 ] | Working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Measurements and Mathematical Modelling of advanced antenna systems (AAS) in IMT‑2020 systems |
48. | [ 305 ] | Working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-23 |
49. | [ 309 ] | Working document being discussed in Drafting Group Article 21.5 |
50. | [ 338 ] | [Preliminary] draft revision of Recommendation ITU-R M.1036-6 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations |
51. | [ 320 ] | Draft working document towards a preliminary draft new Report ITU-R.M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND] |
52. | [ 322 ] | Draft working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE] - Terrestrial IMT for remote sparsely populated areas providing high data rate coverage |
53. | [ 323 ] | Draft working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TDD.SYNCHRONIZATION] |
54. | [ 267 ] | Proposed working document towards a PDNR ITU-R M.[IMT-2020.UNWANT.BS] for "generic unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020" - Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-2020 |
55. | [ 268 ] | Proposed working document towards a PDNR ITU-R M.[IMT-2020.UNWANT.MS] for "generic unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020" - Generic unwanted emission characteristics of mobile stations using the terrestrial radio interfaces of IMT-2020 |